Your project, stage by stage

You'll always know where your design stands, what you'll receive next, and what we need from you. WireDog Architecture works in seven stages, from your first brief to building consent, and you approve each one before the next begins.

At a Glance

Times are typical for a new house and depend on the site, your decisions and council. Alterations and smaller projects usually move faster; we'll confirm timing in your proposal.

​

1. Pre-Design · Written brief and site analysis · 1–2 meetings, one on site · 1–2 weeks

2. Concept Design · Preliminary floor plans · 1 presentation meeting, then your feedback · 2–4 weeks

3. Concept Development · Refined plans, elevations, form and materials · 2–3 review meetings · 3–6 weeks

3A. Resource Consent (if required) · Lodged application and council correspondence · Occasional updates · 4–8 weeks, council included

4. Developed Design · Coordinated design with engineer and consultants · 2–3 meetings on finishes, fittings and cost · 4–6 weeks

5. Documentation · Full drawing set and specification for consent and pricing · Mostly our work, brief check-ins · 6–10 weeks

6. Building Consent · Lodged consent and answers to council questions · Updates as council responds · About 4–8 weeks

1. Pre-Design


We get to know you and your land before anything is drawn.

​

  • What happens: we talk through how you live, what you need now and later, and your budget. We visit the site to understand its slope, sun, wind, views, access and neighbours, and check the district plan and any covenants.

  • What you receive: a written brief and a site analysis summarising the opportunities and constraints.

  • Your involvement: one or two meetings, including a site visit. Gather anything you already have: survey, title, geotech report, photos of homes you like.

  • Decision at the end: confirm the brief reflects what you want.

  • ​

2. Concept Design


The first design ideas, shown as floor plans.

  • What happens: we test how the house sits on the site and how the rooms relate to each other, the sun and the views.

  • What you receive: preliminary floor plans, presented and talked through with you.

  • Your involvement: one presentation meeting, in person or by video, then your feedback. Quick, honest reactions are the most useful thing you can give at this stage.

  • Decision at the end: agree the overall arrangement to take forward. We then fix the fee for Concept Development.

 

3. Concept Development


The plans are refined and the house takes its shape.

​

  • What happens: we work through your feedback, develop the form and roof, and start choosing the main materials.

  • What you receive: refined floor plans, elevations, and an outline of materials and construction.

  • Your involvement: two or three review meetings. Most design changes happen here, when they cost least.

  • Decision at the end: approve the concept. We then fix the fee for Developed Design.

 

3A. Resource Consent (only if required)


Needed when the design goes beyond what the district plan allows outright, for example height, boundary setbacks or earthworks.

​

  • What happens: we prepare and lodge the application, coordinate any specialist reports, and answer council's questions.

  • What you receive: the lodged application and, once granted, the consent and its conditions.

  • Your involvement: occasional updates. You may need to approach neighbours for written approval.

  • Timing: council has 20 working days to decide a non-notified application, and the clock pauses while it waits for further information.

 

4. Developed Design


The design is coordinated with the engineer and other consultants, and the details are settled.

​

  • What happens: we bring in the structural engineer and any other specialists, resolve structure and services, and refine materials, finishes and fittings.

  • What you receive: a coordinated set of developed plans, sections and elevations, with a schedule of key finishes and fittings.

  • Your involvement: two or three meetings to choose finishes, fixtures and appliances. A cost check with a builder or quantity surveyor is worth doing here if necessary.

  • Decision at the end: approve the developed design. We then fix the fee for Documentation. Changes after this point usually mean redrawing and extra cost.

 

5. Documentation


Everything the council and builder need, drawn in detail.

​

  • What happens: we produce the full construction drawings and specification, and coordinate the engineer's drawings and calculations.

  • What you receive: a complete drawing set and specification, ready for building consent and builder pricing.

  • Your involvement: mostly our work. Expect brief check-ins on any remaining choices.

  • Decision at the end: approve the set for lodging with council.

 

6. Building Consent


We lodge the drawings with council and handle its questions until the consent is granted.

​

  • What happens: we lodge the application and respond to council's requests for information.

  • What you receive: the granted building consent, ready to start building.

  • Your involvement: updates as council responds. Council fees are paid by you, directly to council.

  • Timing: council has 20 working days to decide, and the clock pauses each time it asks for more information. Allow 4 to 8 weeks in practice.

 

Throughout the project

​

  • Sign-off at each stage: at the end of every stage we email you to confirm you're happy to move on. A short reply is all that's needed.

  • Your own project page: every client gets a private, password-protected page on our website with current drawings, progress and meeting links.

  • Meetings: in person, on site, or by video call, whichever suits. Video calls open in your browser with no account or download.

  • Changes along the way: changes are welcome, and easiest early. Once a stage is approved, reworking it may affect the programme and fees, and we'll always tell you before any extra work starts.

  • Questions: email or call Andrew any time: andrew@wda.co.nz · +64 27 476 8990.